Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Quality is the future 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsCuplock Scaffolding System

Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection

Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection

    • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection
    • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection
    • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection
    • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection
    • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection
  • Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection

    Product Details:

    Place of Origin: Guangzhou
    Brand Name: JET
    Certification: SGS/EN12810
    Model Number: Cuplock scaffold

    Payment & Shipping Terms:

    Minimum Order Quantity: 5 Tons
    Price: negotiable
    Packaging Details: Strong Load Capacity Scaffolding Cuplock System For Construction With High Materials Standard Cuplock Scaffold In bundles suitable for sea transportation.
    Delivery Time: 15 work days
    Payment Terms: L/C, T/T, Western Union
    Supply Ability: 10000 Tons / Month
    Contact Now
    Detailed Product Description
    Material: Q235 Surface Treatment: Painted
    Advantage: Bearing Capacity Certificate: SGS/EN12810
    Thickness: 3.0-3.5 Mm Diameter: 48.3-48.6mm
    Color: Red Application: Building Construction
    Item: Cuplock Parts Standard: British Standard Scaffolding

    Scaffolding Cuplock System For Construction With High Materials Standard Cuplock Scaffold (Please note that all of our products are accepted OEM requirements)

     

    Product Description


    All of our products can be customed following the customers' requirements.

    Size:

    Standard:

     

    Length(M) Weight(KG)
    Self finish Painted Hot galvanized
    L=0.50 2.42 2.5 2.57
    L=1.00 4.84 4.98 5.13
    L=1.30 6.54 6.74 6.93
    L=1.50 7.25 7.47 7.69
    L=1.80 8.96 9.22 9.49
    L=2.00 9.67 9.96 10.25
    L=2.30 11.37 11.71 12.05
    L=2.50 12.08 12.44 12.81
    L=3.00 14.5 14.93 15.37

     

    Ledger:

     

    Length(M) Weight(KG)
    Self finish Painted Hot galvanized
    L=0.60 2.38 2.45 2.52
    L=0.90 3.44 3.55 3.65
    L=1.00 3.8 3.91 4.03
    L=1.20 4.51 4.65 4.78
    L=1.30 4.87 5.01 5.16
    L=1.50 9.67 5.75 5.91
    L=1.80 11.37 6.85 7.05
    L=2.00 12.08 7.58 7.8
    L=2.50 14.5 9.41 9.69

     

    Intermediate transom:

     

    Length(M) Weight(KG)
    Self finish Painted Hot galvanized
    L=0.60 2.38 2.45 2.52
    L=0.90 3.44 3.55 3.65
    L=1.00 3.8 3.91 4.03
    L=1.20 4.51 4.65 4.78
    L=1.30 4.87 5.01 5.16
    L=1.50 5.58 5.75 5.91
    L=1.80 6.65 6.85 7.05
    L=2.00 7.36 7.58 7.8
    L=2.50 9.14 9.41 9.69
     

     

    Name Length Weight (Kg)
    Self Finish Painted Hot Dip Galvanized
    Diagonal Brace L=0.60Mt 3.59 3.7 3.8
    Diagonal Brace L= 1.3Mt 5.22 5.37 5.53
    Diagonal Brace L= 1.8Mt 7.48 7.71 7.93
    Spigot Connector L=0.25Mt 0.69 0.71 0.73

     

    Product photos


    Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection

     

    Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmental Protection

     

     

     

    Our Advantage


    Our Advantage

    1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .

     

    2. Hot dip galvanizing process, the service life for more than 15 years.

     

    3. New carbon steel, high strength mechanical properties, pole load up to 200KN.

     

    4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.

     

    5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.

     

    6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.

     
    Our Company

    JET has been established in Guangzhou,China.

    We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.

    Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.

    Many of our client base are returning customers whom we have known and worked for many years.

    Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.

     

    FAQ


    1. Question: What's your MOQ(minimum order quantity)?

    Answer: One full container.

     

    2. Question: What's your packing methods?

    Answer: Packed into bundle, and rest in bulk.

     

    3. Question: What's your payment terms?

    Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.

     

    4. Question: What's your delivery time?

    Answer: 10-20 days after received the advance payment or L/C.

     

    5. Question: Are you manufacturer or trader?

    Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

     

    6. Question: Where's your factory?

    Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

     

    7. Question: Can we visit your factory?

    Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

     

    8. Question: Can you supply other scaffolding materials?

    Answer: Yes. All related scaffolding materials.

    (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

    (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

    (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

    (4) steel coupler (preesed / drop forged coupler)

    (5) steel plank with hooks or without hooks

    (6) steel stair case

    Contact Details
    Guangzhou Jet Scaffold & Formwork System Co., Ltd.

    Contact Person: Rachel

    Tel: +8618594912526

    Send your inquiry directly to us (0 / 3000)

    Other Products