Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
Place of Origin: | Guangzhou |
Brand Name: | JET |
Certification: | SGS / CE / EN131 |
Model Number: | Aluminum mobile scaffold tower |
Minimum Order Quantity: | 5 sets |
---|---|
Price: | negotiable |
Packaging Details: | 1. Scaffolding Frame is bare package , loading in containr 2. Shrink Wrapped 3.As you like |
Delivery Time: | 10 work days |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Supply Ability: | 3000 sets per month |
Application: | Household | Packing: | Shrink Wrapped |
---|---|---|---|
Color: | Silver | Thickness: | 1.2mm |
Max Load: | 150kgs | Feature: | Adjustable |
Material: | Aluminum 6063 | Using: | Car Washing,decoration,scaffold,construction |
Multi-functional Mobile Telescopic Tower double Aluminum Alloy Construction Mobile Scaffold Tower
Product Description
Advantage:
1. Install the mounting head quickly, at least five times faster than other manufacturer's products;
2. The connection parts are extruded and formed, and the probability of breaking is zero;
3. The frame shall be welded after three-way connection, and the frame structure shall be firm;
4. Production in strict accordance with Europe's highest safety technical standard en1004:2004, safety guarantee;
5. Scaffolds shall be strictly tested and shall not be used until they meet or exceed the highest safety standards in Europe
Climb Ladder Scaffolding | Double Width | Single Width |
Available Size | 1350*2000mm, 1350*2500mm, 1350*3000mm, |
750*2000mm, 750*2500mm, 750*3000mm |
Height | From 2 meters to 40 meters | |
Platform Load | 272kg | |
Entire Load | 900kg | |
Material | Aluminum alloy 6082-T6 | |
Main Tube | 50.8*2mm |
Our Advantage
Our Advantage
1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .
2. Hot dip galvanizing process, the service life for more than 15 years.
3. New carbon steel, high strength mechanical properties, pole load up to 200KN.
4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.
5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.
6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.
Our Company
JET has been established in Guangzhou,China.
We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.
Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.
Many of our client base are returning customers whom we have known and worked for many years.
Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.
Product Photos
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
Contact Person: Elena
Tel: +8618594921424