Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
| Place of Origin: | Guangzhou , China |
| Brand Name: | JET |
| Certification: | SGS; ISO; CE; |
| Model Number: | Aluminum Scaffolding |
| Minimum Order Quantity: | 2 set |
|---|---|
| Price: | negotiable |
| Packaging Details: | Film or Carton, Other Package Can Be Customized |
| Delivery Time: | 10 - 15 days |
| Material: | Aluminum 6082 | Customize: | Acceptable |
|---|---|---|---|
| Diameter: | 48 Mm | Process: | Laser Cut, Welding |
| Highlight: | tubular welded frame scaffold,walk through scaffold frames |
||
high quality 6m mini aluminium scaffold mobile working tower
| Item | aluminium scaffold tower |
| Material | steel and aliuminium |
| Dimensions | 48mm--60mm |
| Surface | galvanized /painted /or as your request |
| Standard | GB, ANSI, ASME, ASTM, JIS, DIN, BS, EN |
| Length | 750mm--1350mm |
| Thickness | 1.5mm--3mm |
| Type | heavy duty or light duty |
| Feature | Skidprood, Autirust, High Breaking Strength,Durable, easy to assemble & dismantle |
| Note | OEM service is available |
| MOQ | 1000pieces |
| Package | in pallets or in bundle or in bulk |
| Payment Terms | TT,L/C, we can contact in detail |
| Delivery Time |
20-30days |
1. Q: What's your MOQ(minimum order quantity)?
A: Any quantity for the sample and stocks..
2. Q: What's your packing methods?
A: Packed into plywood box/ton bag, or in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
7. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props
Contact Person: Shirley
Tel: +8618688380483