Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
Place of Origin: | Guangzhou,Tianjing |
Brand Name: | JET |
Certification: | SGS,GB |
Model Number: | Alloy 6061 T6 |
Minimum Order Quantity: | 500 square meter |
---|---|
Price: | negotiable |
Packaging Details: | Protective film sticked on profile's visible surface, foam paper interleave each piece. Adequate pieces wrapped in small bundle by shrink plastic film;50-100pcs Per Bulk/ With Steel Plate/ Customized Package |
Delivery Time: | 20 worker days |
Payment Terms: | L/C, D/A, T/T, Western Union, MoneyGram |
Supply Ability: | 500000 square meter per month |
Material: | Aluminum Alloy 6061 T6 | Scaffolding Type: | Aluminum Formwork |
---|---|---|---|
Application: | Building, Construction | ||
High Light: | lightweight scaffold tower,swivel coupler scaffolding |
Alloy 6061 T6 Silver Aluminium Scaffolding Panel Slab Building Formwork System for Concrete Construction
Building aluminum formwork as a new type of building formwork in recent years, more and more places in the world's developed countries can see their applications.
1: The construction efficiency is high and the cycle is short, convenient construction, repeatability, ease of use, and low cost.
2: It has well stability and high bearing capacity, Carrying capacity can reach 60KN per square meter.
3: Aluminum alloy material can be recycled,All materials are renewable materials, energy saving,
environmental protection, low carbon, emission reduction.
4: Less of the Support system, easy to walk.
Large operating space, construction personnel, material handling flow.
5: It also has a wide application scope, Aluminum formwork system is applicable to all building components.
6: The design of a molding with high precision and practical.Very suitable for the standard layer of high-rise, high-rise buildings.
7: Good effect of concrete surface after removal the model.Don't need for plastering, can save two times the cost of plastering.
8: Site doesn't have produce construction waste, It's more safer of construction.
Packaging Details
1. Protective film sticked on profile's visible surface, foam paper interleave each piece. Adequate pieces wrapped in small bundle by shrink plastic film;
2. 50-100pcs Per Bulk/ With Steel Plate/ Customized Package
Port
Guangzhou
Lead Time :
Shipped in 20 days after payment
Material
|
|
Size
|
|
|
|
|
|
|
|
|
|
Company Information
Company Name | Guangzhou Jet caffold&formwork System Co., Ltd |
ISO9001:2015 certified factory for manufacturing and sales of scaffolding | |
19years, 120 workers, 60,000 Sqm2 flooring | |
Auto-welding lines, HDG and painting lines | |
Certification | AS/NZS 1576, ANSI SSFI,SGS,GE |
Main Products | Formwork,Scaffolding pipe, Ringlock Scaffold, Cuplock Scaffold,Steel plank,Scaffolding ouplers, etc. |
Contact Person: liao
Tel: +8615913142989