Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
Place of Origin: | Tian , China |
Brand Name: | JET |
Certification: | SGS , BV , ISO9001 |
Model Number: | 48 * 48 mm scaffolding coupler |
Minimum Order Quantity: | 1500 pcs |
---|---|
Price: | negotiable |
Packaging Details: | Bags + Steel Pallet |
Delivery Time: | 10 - 15 days |
Supply Ability: | 80 ton per month |
Material: | Q235 | Surface: | Galvanized Or Painted |
---|---|---|---|
Application: | Connect The Steel Tube | Life Span: | 3 - 5 Years |
Color: | Silver | Size: | 48.3 * 48.3mm |
Quality and good price Drop Forged Coupler for scaffolding system couplers for scaffolding parts EN/BS/SGS certificates
Scaffolding pipe clamp and parts, An important part of building strength to scaffold clamps in used close up on construction site,platforms for stage structure support.
Assembly with three advanced production line, the factory can produce 800,000 of couplers per month.
Our mill is strictly complying with EN74 class A and class B, BS1139, AS1576 and other domestic and international coupler standard and regulations, manufacturing various drop forged and pressed coupler like double coupler, swivel coupler, and other shaped couplers.
Specification
Item |
JET |
Type |
Drop forged double coupler |
Material |
Q235 |
Size |
48.3mm*48.3mm |
Surface finish |
Electro galvanzied |
Fastener type |
Right-angle coupler, swivel coupler, connecting coupler |
Standard |
EN74 / BS1139 |
Processing |
Drop forged |
Sample |
Free |
Application |
For structure buliding |
Weight |
1.12-1.15kgs |
Packaging |
Plastic bag & carton & pallet , as per as customer requirement |
OEM |
Available |
Packing and payment
Packing |
1.Inner-Plastic Bag; Outer -Standard Carton Box. |
2. 6 plastic bags into one carton, then 13 cartons into one pallet |
|
3. Carton size: 260*260*140mm |
|
4.As your requirement |
|
Port |
FOB Tianjin |
Shipment |
Our shipment will arrange the plan according to customer |
Sample Leadtime: |
3 days for pre-production samples |
Production Leadtime |
Within 12-15 workdays after deposit or payment received |
Payment terms: |
L/C, or 30% pre T/T 70% balance before shipment |
Service |
Warm and quick response service provided by the professional Export Sales Team |
many years' experience in handling exports to the US, Europe,Japan and other countries and regions |
FAQ
1. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS System and building material for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
2. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
3. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
4. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler
(5) steel plank with hooks or without hooks.
(6) steel stair case
Contact Person: Rachel
Tel: +8618594912526