Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
Place of Origin: | Guangzhou |
Brand Name: | JET |
Certification: | SGS,ISO,BV,TUV |
Model Number: | Ringlock scaffolding |
Minimum Order Quantity: | 5 tons |
---|---|
Price: | negotiable |
Packaging Details: | 1.In bulk 2.In bundles with steel strip 3. As you like |
Delivery Time: | 15 work days |
Payment Terms: | L/C, MoneyGram, Western Union, T/T |
Supply Ability: | 500 tons per month |
Material: | Q235 Carbon Steel | Performance: | Doing Well In Repairing Ship |
---|---|---|---|
Usage: | Both Inside And Outside Building, Mainly Outside Use | Surface Treatment: | Painted / Galvanized |
Color: | Orange / Silver | Height: | 2000 Mm |
Thickness: | 3.0mm,3.25mm | Application: | Building Construction |
Durable Hot Dipped Galvanized SGS Certificate Best Scaffold Prices Ringlock Scaffold System Construction Scaffold
Product Description
Features
1. Ringlock scaffold system is made by high-strength welded pipe (48X3.0-3.5mm),which is durable and ensures the workers' safety.
2. Ringlock scaffold system is suitable for building like bridge, tunnel, large-scale construction project with any shape, water conservancy project ,ship building, and so on.
3. Ringlock scaffold system is the latest wedge lock system which is easy assembly and time saving. Due to its high stability and bearing capacity ringlock scaffolding is popular in the world.
4.The main parts of a set of one Ringlock scaffold system includes: the standard, the ledger, the cross brace, the jack base, the stage plank, the ladder, and so on.
5. Ringlock scaffold system could be painted or gavalnized.
Standard of ringlock scaffold system |
Thickness(mm) |
Length(mm) |
Diameter(mm) |
Standard a |
3/3.25 |
3000 |
48 |
Standard b |
3/3.25 |
2000 |
48 |
Standard c |
3/3.25 |
1000 |
48 |
Ledger of ringlock scaffold system |
|
|
|
Ledger a |
3/3.25 |
2000 |
48 |
Ledger b |
3/3.25 |
1770 |
48 |
Ledger c |
3/3.25 |
1000 |
48 |
Our Advantage
1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .
2. Hot dip galvanizing process, the service life for more than 15 years.
3. New carbon steel, high strength mechanical properties, pole load up to 200KN.
4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.
5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.
6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.
Our Company
JET has been established in Guangzhou,China.
We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.
Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.
Many of our client base are returning customers whom we have known and worked for many years.
Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.
Product Photos
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler
(5) steel plank with hooks or without hooks.
(6) steel stair case
Contact Person: Elena
Tel: +8618594921424