Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Quality is the future
Place of Origin: | Tianjin |
Brand Name: | JET |
Certification: | ISO9001:2008.CE |
Model Number: | Australia Kwikstage scaffolding |
Minimum Order Quantity: | 10 tons |
---|---|
Price: | negotiable |
Packaging Details: | 1. Scaffolding Frame is bare package , loading in containr 2. In pallet 3. As you required |
Delivery Time: | 15 - 20 days |
Payment Terms: | MoneyGram, T/T, L/C, Western Union |
Supply Ability: | 1000 Tons / Month |
Length: | 3000 / 2500 / 2000 / 1500 / 1000 / 500 Mm | Color: | Red , Blue , Silver , Orange |
---|---|---|---|
Width: | 1770 / 1150 / 850 Mm | Surface Treatment: | Powder Coated / Dip Painted / Galvanized |
Raw Material: | Q235 / Q345 / Q195 | Load Capacity: | 20 KN |
Ledger Size: | 48.3*3.0mm | Tube Diameter: | 48.3 Mm |
Heavy Duty Steel Rapid Quick Strip Scaffolding Kwikstage Scaffolding Kwikstrip Scaffolding For Support Structure
Product Description
Features:
1. Fast speed of erection and stripping,kwikstage scaffolding maximumly saves time and labour.
2. Versatile in different heights and sizes,kwikstage scaffolding can almost meet requirements of any constructions.
3. Flexible wedge lock connection,kwikstage scaffolding can be used on the uneven ground.
4. Kwikstage scaffolding provides easy access with platform and ladder when used for exterior walls.
5. Kwikstage scaffolding can also be used to suppor floor slab in conjunction with beam and formwork.
ITEM
|
SPECIFICATION
|
MATERIAL
|
FINISHED TREATMENT
|
Standards/Verticals
|
Standard 1.0m
|
Q345
|
Painting, Powder coated, Galvanized, HDG
|
Standards/Verticals
|
Standard 1.5m
|
Q345
|
Painting, Powder coated, Galvanized, HDG
|
Standards/Verticals
|
Standard 2.0m
|
Q345
|
Painting, Powder coated, Galvanized, HDG
|
Standards/Verticals
|
Standard 2.5m
|
Q345
|
Painting, Powder coated, Galvanized, HDG
|
|
|
|
|
Ledgers/Horizontals
|
Ledger 0.650m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Ledgers/Horizontals
|
Ledger 0.914m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Ledgers/Horizontals
|
Ledger 1.219m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Ledgers/Horizontals
|
Ledger 1.524m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Ledgers/Horizontals
|
Ledger 1.829m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Ledgers/Horizontals
|
Ledger 2.000m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
|
|
|
|
Transom
|
Transom 0.650m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Transom
|
Transom 0.914m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Transom
|
Transom 1.219m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Transom
|
Transom 1.524m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Transom
|
Transom 1.829m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
|
|
|
|
Diagonal Brace
|
Diagonal Brace 1.635m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Diagonal Brace
|
Diagonal Brace 1.757m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Diagonal Brace
|
Diagonal Brace 1.933m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Diagonal Brace
|
Diagonal Brace 2.138m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Diagonal Brace
|
Diagonal Brace 2.365m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
|
|
|
|
Tie Bars
|
Tie Bars 0.650m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Tie Bars
|
Tie Bars 0.914m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Tie Bars
|
Tie Bars 1.219m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Tie Bars
|
Tie Bars 1.829m
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
|
|
|
|
Hop Up Bracket
|
Hop Up Bracket
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Toe Board Clip
|
Toe Board Clip
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
End Toe Board Bracket
|
End Toe Board Bracket
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Step Down Bracket
|
Step Down Bracket
|
Q235
|
Painting, Powder coated, Galvanized, HDG
|
Product Photos
Our Advantage
Our Advantage
1.Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .
2.Hot dip galvanizing process, the service life for more than 15 years.
3.New carbon steel, high strength mechanical properties, pole load up to 200KN.
4.Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.
5.Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.
6.Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.
Our Company
JET has been established in Guangzhou,China.
We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.
Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.
Many of our client base are returning customers whom we have known and worked for many years.
Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
Contact Person: Elena
Tel: +8618594921424