Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Quality is the future 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsRinglock Scaffolding System

Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding

Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding

    • Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding
    • Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding
    • Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding
    • Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding
  • Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding

    Product Details:

    Place of Origin: Guangzhou
    Brand Name: JET
    Certification: SGS,ISO,BV,TUV
    Model Number: Ringlock Scaffold

    Payment & Shipping Terms:

    Minimum Order Quantity: 5 Tons
    Price: negotiable
    Packaging Details: 1.In bulk 2.In bundles with steel strip 3.As you required
    Delivery Time: 15 work days
    Payment Terms: L/C, T/T, Western Union
    Supply Ability: 10000 Tons / Month
    Contact Now
    Detailed Product Description
    Material: Steel Q235 Q345 Surface Treatment: Hot Dip Galvanized, Pre-galvanized,painted
    Application: Building Construction Technology: Automatic Welding
    Performance: Versatility & Light Weight Scaffolding System Tube Dia: 48 Mm
    Welding Distance: 500mm Using Life: For 7-8 Years
    Usage: Both Inside And Outside Building OEM: Available

    Factory Direct Sell Cantilever Scaffold Stair Tower Ringlock Scaffold Layher Scaffolding System For Sale

     

    Product Description


    Product

    Ringlock scaffolding system

    Size

    Outer diamater (mm)

    Outer tube (mm)

    Standard length(mm)

    Thickness (mm)

    (more customized

    size available)

     

    60mm

    48mm

    0.5m,1m,1.5m,2.0m or

    as customer's request

    2.75/3.0/3.25

    Material

    Q235 carbon steel,or Q345, STK 400 or 500

    Surface treatment

    Hot Dip Galvanized(HDG); cold galvanized; powder coated; painted

    Color

    Orange, dark red, blue,silver,galvanized or as you required

    Welding technique

    CO2 arc Welding

    MOQ

    25 ton

    Delivery time

    20 days after deposit

    Package

    Packed with steel,or film,or as customer’s request

    Production capacity

    50 tons for each day

    Our Advantage


    1.Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .

     

    2.Hot dip galvanizing process, the service life for more than 15 years.

     

    3.New carbon steel, high strength mechanical properties, pole load up to 200KN.

     

    4.Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.

     

    5.Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.

     

    6.Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.

     

    Our Company


    JET has been established in Guangzhou,China.

    We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.

    Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.

    Many of our client base are returning customers whom we have known and worked for many years.

    Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.

    Product Photos


    Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding

     

    Layher Ringlock Scaffolding System Cantilever Stair Tower Scaffolding

     

     

     

    FAQ


    1. Question: What's your MOQ(minimum order quantity)?

    Answer: One full container.

     

    2. Question: What's your packing methods?

    Answer: Packed into bundle, and rest in bulk.

     

    3. Question: What's your payment terms?

    Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.

     

    4. Question: What's your delivery time?

    Answer: 10-20 days after received the advance payment or L/C.

     

    5. Question: Are you manufacturer or trader?

    Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

     

    6. Question: Where's your factory?

    Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

     

    7. Question: Can we visit your factory?

    Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

     

    8. Question: Can you supply other scaffolding materials?

    Answer: Yes. All related scaffolding materials.

    (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

    (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

    (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

    (4) steel coupler (preesed / drop forged coupler

    (5) steel plank with hooks or without hooks.

    (6) steel stair case

    Contact Details
    Guangzhou Jet Scaffold & Formwork System Co., Ltd.

    Contact Person: Elena

    Tel: +8618594921424

    Send your inquiry directly to us (0 / 3000)

    Other Products